
From Germany to Bolu / Turkey
One Complete Melamine Board Manufacturing Line was dismantled and shipped by both 40 OT out of gauge containers and break bulk cargo by chartered vessels from Duisburg to Mengen Bolu.
Total 14 containers + 23 pieces
Pick up 1st piece:24 August
Departure from Antwerp: 06 September
Arrival Gemlik: 19 September
Delivery last piece: 02 October
From Italy to Bolu / Turkey
One Complete Melamine Board Manufacturing Line was dismantled and shipped by both 40 OT out of gauge containers and by out of gauge trucks from Gambolo Pomponesco to Bolu the main body was 80 tons with following dimensions LxWxH 5.5 x 3.60 x 3.80 m.